International Skiing History Association


Go Back   Skiing History Forums > International Skiing History Association > ISHA Forum
Register FAQ Members List Calendar Search Today's Posts Mark Forums Read

Reply
 
Thread Tools Search this Thread Display Modes
  #1  
Old 05-26-2005, 05:03 AM
Guest
 
Posts: n/a
Default chair lift

wasn't the first chairlift installed in Sun Valley? (not in new hampshire as stated in the history page) Or maybe their are a bunch of places that claim to have been the first?
Reply With Quote
  #2  
Old 05-29-2005, 12:34 PM
Seth Seth is offline
Administrator
 
Join Date: Jun 2003
Location: Boulder
Posts: 141
Default

Yes, the first chairlift, designed by Jim Curran, was installed at Sun Valley in 1936. Where on the skiinghistory site did you find any reference to New Hampshire as the site of the first chairlift? If you can point specifically to the error, I'll correct it.

Seth
Reply With Quote
  #3  
Old 12-02-2007, 08:48 PM
Tom @ Snake River
 
Posts: n/a
Default first chair lifts

Also a Mr.Castagneto helped design the first chair lift. These guys were Union Pacific engineers (as in technical engineering) and designed the lift after the bannana trollies used in South America.
I got this info from Mr. Castagneto's son whom I worked with. I grew up on the 2nd oldest ski hill in Idaho - Bear Gulch. Tom
Reply With Quote
  #4  
Old 07-02-2009, 10:34 AM
Bob Arnold Bob Arnold is offline
Junior Member
 
Join Date: Feb 2008
Location: Bow, NH
Posts: 2
Default The Second Chairlift

My research has Sun Valley's chairlift installed in December 1936. The March 8, 1937 issue of Life magazine did a cover story on the lft. Belknap Mountain Recreation Area (now Gunstock) installed the second single chair, and first east of the Mississippi, for the 1937-38 sski season. My grandfather, Fritzie Baer, was manager of Belknap from 1950-59. In the summer of 1956, the cable on this chair broke, killing one person. Due to the rough ride caused when the cable would travel over a pulley on a support, the chair manufacturer had designed a rubber sleeve to fit over the cable where the chair was attached. Unintentionally, this trapped water, causing corrosion and eventual failure. Due to this accident, the NH Tramway Safety Act was passed to inspect ski lifts and became the model for similar acts in other states.
Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -6. The time now is 09:17 AM.


Powered by vBulletin Version 3.6.1
Copyright ©2000 - 2010, Jelsoft Enterprises Ltd.